Reference for you...
I live in NC. The TPW for my 02 Z06 was 8/6. The car was built on Monday the 6th and delivered to my dealer on Thursday 8/9. I took delivery on the 10th.
My 2001 coupe had a TPW of Monday 9/25/00. It was built on Saturday 9/23/00. It was the last vette loaded on the truck but at the last minute was removed and replaced with a 01 Z06 bound for my dealer. The shipping docs had my coupe's VIN scratched out and the rogue Z's VIN penciled in. I ended up having to wait another week and took delivery on 10/6/00. Otherwise I would have taken delivery the same week as the TPW, too.
I live in NC. The TPW for my 02 Z06 was 8/6. The car was built on Monday the 6th and delivered to my dealer on Thursday 8/9. I took delivery on the 10th.
My 2001 coupe had a TPW of Monday 9/25/00. It was built on Saturday 9/23/00. It was the last vette loaded on the truck but at the last minute was removed and replaced with a 01 Z06 bound for my dealer. The shipping docs had my coupe's VIN scratched out and the rogue Z's VIN penciled in. I ended up having to wait another week and took delivery on 10/6/00. Otherwise I would have taken delivery the same week as the TPW, too.